Civic Center 2nd Floor Renovation Project

The proposed project includes the renovation of multiple rooms on the second floor of the Dublin Civic Center. All work is to be performed outside Civic Center normal business hours. This includes the demolition and removal of existing finishes, storage system, doors; construction and alteration of new wall and existing ceiling and storefront systems; extension and alteration of existing building HVAC, Electrical and Low Voltage AV and Data systems to service new spaces. Please refer to the Project Documents (Drawings and Technical Specifications) for full detailed scope of work.

Status

Bidding Closed

Prebid Date7/20/23 2:00pm

Bid Date8/15/23 2:00pm

Company & Contacts

City of Dublin
Michael Boitnott  
michael.boitnott@dublin.ca.gov

Location

Dublin Civic Center, 2nd Floor - 100 Civic Plaza, Dublin.

COST ESTIMATE: The City’s estimated total construction cost for this Project is between $200,000 -
$300,000. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the
bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range.