Public Jobs

Bids due in 18 days
5/15/24 2:00pm
Green Stormwater Infrastructure
Bids due in 18 days
City of Dublin
Dublin, CA
Bids due in 19 days
5/16/24 2:30pm
Safe Routes to School Improvements
Bids due in 19 days
City of Dublin
Dublin, CA
Bids due in 26 days
5/23/24 2:00pm
Jordan Ranch Neighborhood Square
Bids due in 26 days
City of Dublin
Dublin, CA
PROJECT SCOPE: The proposed 2- acre park project includes the construction of a multi-use court, group picnic area, fitness stations, lawn area and children’s play area. The work includes but is not limited to earthwork, storm drainage, playground equipment, sports equipment, chain link fencing, site furnishings, stabilized decomposed granite paving, shade structure, site concrete, asphalt concrete paving, electrical, irrigation, soil preparation and planting.
Bids due in 17 days
5/14/24 2:00pm
2024 Annual Street Resurfacing - Concrete, Signals & Overlay Project
Bids due in 17 days
City of Dublin
Dublin, CA
Bidding Closed
3/26/24 2:00pm
Annual Street Resurfacing - 2024 Dublin Slurry Seal Project
Bidding Closed
City of Dublin
Various streets in the Dublin Ranch and Positano Parkway areas in the City of Dublin.
PROJECT SCOPE: The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: surface preparation, cracksealing, slurry seal, removal of pavement markings and striping, installation of new pavement markings and striping, traffic control, and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.
Alamo Creek Park and Assessment District Fence Replacement Project (PK0122)
City of Dublin
Dublin, CA
PROJECT SCOPE: The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: The full removal and disposal of existing ornamental metal fencing along Fall Creek Road, Dougherty Road and Wildwood Road, and replacement with new 6’ height vinyl coated chain link fencing and chain link pedestrian gates and vehicular maintenance gates, 48” height decorative metal fencing on existing monument sign and culvert walls, and the patching and painting of the existing monument signs at Alamo Creek Park all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.
Bidding Closed
9/13/23 2:00pm
Iron Horse Nature Park and Open Space Project
Bidding Closed
City of Dublin
Dublin, CA
PROJECT SCOPE: The Iron Horse Nature Park and Open Space Project: Phase 1 (Project) located in Dublin, California is a nature park and open space with a trail and recreation facilities. The Project area will extend approximately 2,000 feet north from the intersection of Amador Valley Boulevard along a former railroad embankment and into existing facilities at Stagecoach Park. The Project will include a new 12-foot-wide asphalt concrete (AC) paved trail spanning approximately 2,000 linear feet with two-foot-wide aggregate base (AB) shoulders on either side. Spur pedestrian trails will be constructed near the north end of the Project to connect to the existing Iron Horse Trail to the west and Stagecoach Park to the east. Both spur trails will include an embankment and/or ramp and culverts to convey existing drainage swales. Near the northern end of the Project an existing railroad trestle bridge associated with the former railroad containing creosote-coated wood will be removed, and a new arch bridge with concrete headwall and wingwalls and embankment will be constructed in its place. The Project also includes park and landscape amenities, fiber optics conduits, planting, irrigation, recycle water relocation, and concrete sidewalk, curb, gutter, and driveway.
Bidding Closed
8/15/23 2:00pm
Civic Center 2nd Floor Renovation Project
Bidding Closed
City of Dublin
Dublin Civic Center, 2nd Floor - 100 Civic Plaza, Dublin.
The proposed project includes the renovation of multiple rooms on the second floor of the Dublin Civic Center. All work is to be performed outside Civic Center normal business hours. This includes the demolition and removal of existing finishes, storage system, doors; construction and alteration of new wall and existing ceiling and storefront systems; extension and alteration of existing building HVAC, Electrical and Low Voltage AV and Data systems to service new spaces. Please refer to the Project Documents (Drawings and Technical Specifications) for full detailed scope of work.
Bidding Closed
7/24/23 2:00pm
July 2023 Slurry Seal Project
Bidding Closed
City of Dublin
Dublin, CA
The Project is more specifically defined in the Contract Documents, but generally includes: furnishing all labor, materials, tools, equipment, transportation, and services necessary to perform the construction and installation of the following: slurry seal, mill and fill, pavement failure repair, removal and disposal of excessive material and debris, oil deposit removal, crack sealing, removal of pavement markings and striping, installation of new pavement markings and striping, traffic control, and other items not specifically mentioned herein, and doing all appurtenant work in place and ready for use, all as shown in the Specifications, Special Provisions, and other Contract Documents entitled as shown above, now on file in the office of the Public Works Director, to which reference is hereby made for further particulars.
Bidding Closed
7/25/23 2:00pm
Wallis Ranch Community Park
Bidding Closed
City of Dublin
Dublin, CA
The proposed project includes the construction of a dog park, four lighted pickleball courts, three lighted tennis courts, one lighted tennis court with striping overlay four pickle ball courts, two basketball courts, parking area, two restrooms, group picnic area and children’s play area. The work includes but is not limited to earthwork, storm drainage, playground equipment, sports equipment, chain link fencing, site furnishings, stabilized decomposed granite paving, shade structure, site concrete, asphalt concrete paving, electrical equipment and controls, lighting, irrigation, soil preparation and planting.