Heritage Park and Museums - Improvement Plans

Work of this Contract for the Heritage Park and Museums – Improvement Plans, City of Dublin, includes the construction of an arbor, picnic area, plaza, pedestrian pathways and landscaping. The work includes but is not limited to demolition, metal fabrication, site furnishings, site preparation, earthwork and grading, flexible paving, pavers, concrete flatwork, pavement marking, irrigation and planting

PRE-BID MEETING: Contractors bidding the project are not required to attend one of the two pre-bid conferences prior to bidding. The pre-bid conferences are scheduled for March 8 2021 at 10:00 A.M. and March 10 2021 at 2:00 P.M., each will cover the same material and will be located at Old St. Raymond’s Church at 6600 Donlon Way, Dublin, CA. Sub-contractors are not required to attend the pre-bid conference.

COST ESTIMATE: The City’s estimated total construction cost for this Project is between $900,000-$975,000. The estimate is intended to serve merely as a guideline of the magnitude of work. Neither the bidders nor the contractor shall be entitled to claims because of any inaccuracy in the estimated cost range.